# PROJECT NAME YEAR LOCATION EVIDENCE
1 Tank Review 0665 and 0561 in ISLA B.V Refinery. Repair of tank walls, floors and roof. Conservation Complete.2005Curaçao
2 Tank Review 9117 in ISLA B.V Refinery. Repair of tank walls, floors and roof. Conservation Complete.2007Curaçao
3 Revision of Tank 9103 in ISLA B.V Refinery. Repair of walls and floors. Demolition of the existing roof and installation and manufacturing of the tank roof. Full conservation.2008Curaçao
4 Installation of reinforcements and cold cuts with pressurized water, of access door to tanks (0665, 7500 and 0147) in ISLA B.V. Refinery.2014Curaçao
5 Review of Tank 7500 in ISLA B.V Refinery. Repair of walls, floors and roof of the tank. Conservation Complete.2016Curaçao
6 Review of Tank 0248 in ISLA B.V Refinery. Repair of walls, floors and roof of the tank. Conservation Complete.2018Curaçao
7 Review of Tank 2344 in ISLA B.V Refinery. Repair of walls, floors and roof of the tank. Conservation Complete.2018Curaçao
8 Review of Tank 2345 in ISLA B.V Refinery. Repair of walls, floors and roof of the tank. Conservation Complete.2018Curaçao

Scheduled Maintenance Stop

# PROJECT NAME YEAR LOCATION EVIDENCE
9 Execution of maintenance stop at Gastail 5 in ISLA B.V. Refinery.2010Curaçao
10 Execution of maintenance stop at Hotoil North 5 in ISLA B.V. Refinery.2016Curaçao

Transportation

# PROJECT NAME YEAR LOCATION EVIDENCE
11 Heavy load transfer of Generators - Wartsila Company.2018Curaçao
12 Tree transfer for Hilton Hotel.2019-
13 Transfer of a water tank for dijtham.2019-
14 eavy machinery transfer for Albatroz - Cargo Company (Destination: Construction of Courtyard Marriott Hotel).2020-
15 Safe execution of heavy transport from Curaçao port to Mijnmaatschappij.2020Curaçao

Lifting Projects

# PROJECT NAME YEAR LOCATION EVIDENCE
16 Movement and lifting of Submarine in Bonaire.2019Curaçao
17 Lifting project for Dutch Navy.--
18 Several important oversized load lifting projects.--
19 Lifting projects for Royale Marine Services.2020-
20 Lifting Work for a CPA Ferry.2020-
21 Lifting Work performed on a Pontoon.2020-
22 Lifting Work of our 75 ton Crane on Platform at sea in Bonaire.2020Bonaire

Plant Construction and Pipelines projects

# PROJECT NAME YEAR LOCATION EVIDENCE
23 Drainage line repair Of FEU 2. ISLA B.V. Refinery.2015Curaçao
24 Cold cuts of pipes, manufacture and installation of 32'' and 36'' pipes in ISLA B.V. Refinery.2015Curaçao
25 Installation and Connection of sewage pipes Usona - SEWERAGE Project.2013Bonaire
26 Installation of white water pipes in Aqualectra - Sanering Project Kustbatterij.2016Curaçao
27 Construction of a Water Plant for IDE. WEB .2021Bonaire

Windmills Removal, Transportation and Lifting

# PROJECT NAME YEAR LOCATION EVIDENCE
28 Withdrawal of 12 windmills and transport to port. Wind Power - MainWind B.V.2009Curaçao
29 Transportation of 12 windmills and lifting them. Wind Power - ENERCON.2009Bonaire
30 Withdrawal of 12 windmills and transport to port. Wind Power - MainWind B.V.2009Curaçao

Heavy Machinery Leasing

# PROJECT NAME YEAR LOCATION EVIDENCE
31 Annual 300 TON Hydraulic Crane Contract in ISLA B.V. Refinery.2016Curaçao

Manufacture and Installation of Brackets in antennas

# PROJECT NAME YEAR LOCATION EVIDENCE
32 Manufacture, Conservation and Installation of Brackets in UTS antennas.2016Curaçao

Demolishment works

# PROJECT NAME YEAR LOCATION EVIDENCE
33 Demolition of the second phase of Aqualectra located in Mundo Nobo.2016Curaçao
34 Demolition of Trans World Radio.2019Curaçao

Welding works and metal structures

# PROJECT NAME YEAR LOCATION EVIDENCE
35 Boat restoration "Havendienst 1" for passenger transfers from Punda to Otrobanda.-Curaçao
36 Pontoon manufacturing and restoration.-Curaçao

Other Proyects

# PROJECT NAME YEAR LOCATION EVIDENCE
37 Installation of water desalination plant in Curacao Refinery Utilities N.V (CRU). SWRO 300 TON.2013Curaçao